City of Garden City Wastewater Project

Our team helped the City of Garden City update their lift stations throughout the city to increase performance of their sewage system. When the lift stations would lose power, the pumps wouldn’t work allowing sewage backup into residents’ homes. Yuck! Decker Electric installed new Cummins generators at two lift stations along with control panels and control circuits to prevent sewage back ups from occurring. Our team has enjoyed working with Scott Mueller, Walters-Morgan Construction (Manhattan, KS), and his team on this project.