Standby Generator Project EKAE Garnett, KS

Standby Generator Project

Standby Generator Project EKAE Garnett, KS

In the summer of 2020, Decker Electric completed the install of three 500 KW standby generators, a 2,000 amp distribution panel & two 1,200 amp tap boxes.

We installed over 1,400 feet of temporary power cables & 400 feet of permanent power wiring along with several communication cables.

This will give the renewable unit backup power to assure no power interruptions. This was a complete design build job by Decker Electric.

Marty Mapes, James Helten, John Perkins, Norman King, Scott Nelson & Bryan Wallace all helped to make this job be a success.

This project was quickly followed with another to do a permanent install of three 500 KW tier 4 generators.